5 Step Install

Our expert technical team will handle every step of installation.
5 Step Install
- SURVEY: Record proposed room layout and dimensions noting any objects that might block emitted UV light from lamp.
- POWER: Note power source(s) locations for required lamp installation position, and / if possible required additional power sources.
- SET-UP: Enter recorded information into the UV lighting app to generate a 2 dimensional light coverage display for the area, adjust lamp(s) position(s) to provide optimal coverage of area. (once lamp position is confirmed, suitable power supplies / amendments must be confirmed)
- INSTALL: Fit lamp to confirmed position, connect power supply and commission lamp.
- COMMISSIONING: Verify operation, time schedule etc and demonstrate operation to customer.